Below are the construction updates on the progress being made at Marcella Jordanelle Ridge for Spring 2025.
- Irrigation lake completed and filled.
- The irrigation system has been turned on and water is flowing.
- Sod has been installed on holes 3, 5, 6, 7, 11, 10.
- Topsoil is being hauled and placed on remaining holes in anticipation of sod installation.
- Driving range grading is 90% completed.